From Quote to Ship—Fast.
Quotes in ≤ 24 h, standard production 15-20 days, prototype samples 5 days—all backed by validated process controls. Request an Express Quote and put our fast-turnaround CNC machining pipeline to work for you.
CTA: Get a Quote
Speed-at-a-Glance
Three stat cards:
KPI | Value |
Quotation turnaround | ≤ 24 hours |
Standard machining cycle | 15-20 calendar days |
Prototype (turning/milling) sample | 5 days door-to-door |
Such metrics drive manufacturing lead time reduction across the full job scope.
How It Works—End-to-End Timeline
Horizontal stepper graphic:
Step | Typical Duration | Technical Notes |
RFQ Upload & DFX review | Day 0 | Secure portal upload; native CAD + STEP/IGES supported. |
Counter-drawing & design optimization | 1-3 days | Includes GD&T clarification and cost-down suggestions. |
Raw-material procurement | ~ 7 days | Global mill stock checked first; off-list alloys ordered JIT. |
CNC machining & secondary ops | 15-20 days | ±0.05 mm capability on multi-axis centres. |
Testing & inspection | 3 days | CMM, optical spectro-analysis, Rockwell hardness. |
Packing & export logistics | 10 days | ISO-crate, vacuum-sealed, or VCI + desiccant per spec. |
Procurement time drops to ≤ 2 days when the material is on-hand.
Express Upgrade Options
Three-column block with icon list:
Option | Lead-Time Impact | Detail |
Express Quote | CAD‐to‐quote in ≤ 6 h | Priority estimator queue running 18 x 6 (Mon-Sat). Derived from the standard 24 h benchmark. |
Rapid Tool-Path Programming | May cut programming window by 50% | Simultaneous 3-axis + 4-axis post-processing; NC verified via digital twin. |
Weekend Run Slot | Shrinks machining phase to ≤ 10 days | Reserved spindle hours on high-speed mills and twin-turret lathes. |
48 h Proto-Dispatch | Samples on the courier within 5 days total | Applies to turning/milling parts up to Ø200 mm x 150 mm. |
Such accelerators, layered atop our baseline process, deliver measurable manufacturing lead time reduction without compromising process capability indices (Cpk ≥ 1.33 on critical dimensions).
Manufacturing Capabilities & Materials

Image Link: https://www.shutterstock.com/image-photo/burning-blacksmith-forge-making-metal-items-1124057765
Processes
- CNC milling & turning (±0.05 mm)
- Forging / casting, progressive-die stamping, surface finishing
- CAD/Pro-E design for manufacturability, plastic-injection mold development, and metal/plastic additive manufacturing
Material Portfolio
- Metals—Brass/Bronze/Copper, Aluminum, Free-cutting & stainless steels, Zinc/Magnesium alloys, Titanium
- Non-metals—Nylon, POM, ABS, PP, PTFE, NBR/EPDM/FPM silicone rubbers, graphite composites
Quality Assurance
Our plant is ISO 9001:2000 certified. Incoming material verification, in-process SPC, and a 50% final-lot inspection protocol are mandatory gates before any shipment leaves the dock.
Instrumentation includes optical metal analyzers, Rockwell hardness test rigs, 2D vision systems, and calibrated CMMs, so accelerated schedules never erode compliance.
Why Choose Us
- 12 years of continuous OEM/ODM metal parts production
- Broad, multi-process capability under one roof for fast-turnaround CNC machining programs.
- Data-driven routing and finite-capacity scheduling software that flags bottlenecks in real time.
- Dedicated export team fluent in Incoterms 2020 and dual-use compliance.
Call-to-Action
Upload your CAD today and receive a stamped production schedule within the next business day.
[Request Express Quote]
FAQ
Do You Really Guarantee A ≤ 24 H Quotation?
Yes. Standard alloys receive a firm price and schedule within one working day.
How Is The 15-20 Day Machining Lead Time Calculated?
It represents net shop-floor days from raw-material release to in-house QC completion for batch production.
What Surcharge Applies To Express Upgrades?
Express surcharges vary by slot availability and complexity but are 15-30% over base machining cost. They cover premium spindle allocation, extended shifts, and expedited logistics.